Westsail 321: projects

Showing posts with label projects. Show all posts
Showing posts with label projects. Show all posts

Thursday, April 15, 2010

Stern pulpit

Last weekend we had sunny weather, so we decided to mount the stern pulpit. The project actually went fairly hitch free. Drilled holes were straight and in alignment and only one thing got dropped in the water, and that item was expendable anyways.
The first is a photo of the stern before the pulpit. Except for the main sheet running through the pulleys back there, it's a bit of a open space where you can get rather intimate with Poseidon and his realm. Exhilarating but sometimes a little precarious.

The next two photos are with the stern pulpit. It's a little hard to see it well, but the pulpit encloses the space and creates a bit of security. A set of life lines will be added halfway down from the upper rail to close it up more.

Pinrail project complete




The pinrails are now on. It took a bit of cautious but assertive use of the rubber mallet to get them positioned onto the shrouds. So far they are a great help in organizing all the lines!

Thursday, March 4, 2010

V berth insulation project

The installation of the new insulation in the v berth was finished a few weeks ago. Here I'm re-attaching the slats. The blue tape marks the sequence, and this is a trick I would never have thought up by myself.










Here is the finished project. The insulation is white, which gives it a different look than the original insulation. Our only other color choice was black and I thought that would be too dark.


The insulation is a closed cell Volara foam with an adhesive backing.





Before I adhered the new insulation, we replaced the whisker tangs; access to the tang bolts was made easy with the absence of insulation and wooden slats. (The bolts go through the hull and are accessed in the v berth.)

If you look closely at the photo you can see rust stains. That is from the old tang, which is why we wanted them replaced. These tangs secure the whisker stays which lead up and attach to the front of the bow sprit.


Here's one other finished project that has been on the list for months. These are the anchor rode locker doors, and the latches are new. Before, there was no means to keep the doors shut, and since the heavy anchor chain is stored behind these doors, we needed to be able to secure them.

Before I could install the latches though, I had to sand the doorway openings larger so the doors could actually close. The installation of the new samson posts (which are located between these doors (you can see the 2 bolts)) had caused some shifting in all the woodwork here, causing things to no longer fit as before.

Monday, February 22, 2010

A very large package arrives

I came home from work this evening to find a very large box taking up a fair amount of space in our very small living room.















It turned out to be our stainless steel stern pulpit which Matt ordered from Bud Taplin a few weeks ago. I was either not told of the order, or was and just wasn't listening (which is always a possiblity) but either way it made the arrival of the package a surprise, and surprises are often fun.
The mounting of the pulpit to Wecantu's stern will be a bit of a project, but I hope to post before and after photos in the near future.




Tuesday, December 1, 2009

Belay Pins from Thailand

One of Matt's projects to make pinrails for the boat. We decided to order up some belay pins rather than trying to make our own, and after a bit of internet research he finally found a place in Thailand that manufactures the size we needed.
They just arrived yesterday, and Matt can carry on with the project. He's made the pinrails, and now that the pins are here he can drill holes in the rails for the pins to go through. Oh, except that he discovered that the actual pins are ever so slightly bigger than the specs stated, so he needs an ever so slightly bigger bit for the drill press, which needs to be ordered, so we'll have to wait for that to arrive. Ah, boat projects.

Sunday, September 27, 2009

Boomkin project part 2















The restored boomkins were put back on this past weekend. It was a much easier project than the bowsprit.

About Me

My photo
Westsail 32, Hull #321
SV Wecantu